Connection Portal

Does the grid have room for your project?

Describe your project and we will show which substations in the area can take you on – and what it takes to get connected.

Enter your email to apply for a connection. We will send you a one-time code.

You do not need to know your electricity demand up front.

061218Available capacityWith your projectExisting demand
A winter day: your project added on top of the demand already there.

Four steps to an answer

  1. 1/4

    About the project

    Type of business, size, and when you plan to start.

  2. 2/4

    Operating pattern

    Daytime, continuous – or not sure yet.

  3. 3/4

    Preliminary electricity profile

    Winter and summer, weekday and weekend.

  4. 4/4

    Compare locations

    Grid fit, timing, risk, and forecast outlook.

What you get

Estimated peak demand

An estimate in MW based on business type and operating pattern, before you have metered data.

Fit against the grid

Which of your preferred locations have available capacity today, and which will later.

Application-ready basis

A summary you can take further to the grid company.

Power line in front of a snow-covered glacier

Ready to test your project against the grid?

Create an account – filling in the form takes a few minutes.

Get started

Indicative assessment. Final connection is confirmed by the grid company.